Patterson Building Group Pty Ltd was appointed by the University of Sydney as head contractor to undertake the demolition of existing offices at the heritage listed Sydney Eye Hospital and the refurbishment of the lower floor area into research space; the construction of a mezzanine with open plan space and offices and the fitout of PC2 laboratories.
The refurbishment provides a mezzanine with an open plan area for post graduates and offices for staff.
The larger lower floor area provides lab benches, a separate histology lab and a separate electro physiology lab.